ANALYTICS
Work Patterns
AT A GLANCE
PORTFOLIO PULSE
95Last entry: 1 day ago · Shipped this month: 15 · Active projects: 5
FEATURE PIPELINE
ACTIVITY
Build activity heatmap: 18 entries logged between 2026-03-01 and 2026-04-18.
Build activity heatmap: 18 entries logged between 2026-03-01 and 2026-04-18.
BY MONTH
Monthly activity: MAR '26: 20 entries, APR '26: 18 entries.
WHAT'S HAPPENING
◎ CURRENTLY BUILDING
- SAVE STATEDynamic site — Supabase-backed portfolio
- CURRENT OSPredictive scheduling — AI-driven schedule optimization
○ WHAT'S NEXT
- SAVE STATEHealth monitoring — live service status
✓ RECENTLY SHIPPED
- SAVE STATEAnalytics dashboard — cross-project work patternsMAR 24
- SAVE STATE/log skill — cross-project entry authoringMAR 23
- SAVE STATEContent engine — markdown-to-HTML pipelineMAR 23
- SAVE STATEChangelog — filterable session logMAR 23
- CURRENT OSShed — AI-powered home project trackerMAR 22
- BARKWindows service — NSSM auto-start on bootMAR 21
- BARKCooldown logic — rapid-fire preventionMAR 21
- BARKBetter Ears — configurable detection sensitivityMAR 21
BY PROJECT
ENTRY DISTRIBUTION
Current OS: 12 entries, Save State: 8 entries, Lore: 8 entries, Taproot: 5 entries, Bark: 3 entries, Claude Code Setup: 2 entries.
FOCUS SCORE
Based on 38 entries across 6 projects. Herfindahl index — 1.0 means all work in one project, 0.17 means perfectly even.
FEATURES VS ENTRIES
CURRENT OS
BARK
SAVE STATE
CLAUDE CODE SETUP
LORE
TAPROOT
CONTENT & VOCABULARY
TAGS
TECH STACK
TypeScript: 4 projects, Next.js: 3 projects, Supabase: 2 projects, Claude API: 2 projects, Node.js: 1 project, Discord.js: 1 project, NSSM: 1 project, Tailwind CSS: 1 project, Vercel: 1 project, Claude Code: 1 project, Bash: 1 project, GitHub MCP: 1 project, Context7 MCP: 1 project, Fastify: 1 project, Prisma: 1 project, PostgreSQL: 1 project, Redis: 1 project, LiveKit: 1 project, Socket.io: 1 project, React 19: 1 project, Expo: 1 project, Tauri: 1 project, Proxmox VE: 1 project, Docker: 1 project, LXC: 1 project, ZFS: 1 project, Ubuntu: 1 project.
CONTENT DEPTH
LONGEST ENTRY
Steps 6 + 8 complete — Vaultwarden live, rootstack.dev tunnel operational · 457 words
Power user setup — Steps 1 through 8: 157 words, Claude Code Setup — power user environment shipped: 176 words, Intelligence Foundation — corrections, lifecycle, normalization: 145 words, Intelligence Foundation — AI scheduling layer shipped: 137 words, Calendar sync — Google Calendar integration shipped: 117 words, Bark — AI feature suite shipped: 160 words, Better Ears + Smart Brain — Claude-powered audio intelligence: 145 words, Shed — Home Projects feature shipped: 107 words, Shed — AI home project tracker shipped: 138 words, Save State — brainstorm and naming: 99 words, Save State — initial launch shipped: 136 words, Save State — built and deployed: 211 words, Data lifecycle complete — /ship, visual treatment, guardrails: 287 words, Data lifecycle — voice profile, entry types, dynamic config, /wrap: 232 words, /ship skill — shipped: 167 words, Lore — debut: 159 words, Mode separation, RLS cleanup, issue sweep: 312 words, RLS recursion root cause found and fixed — commit-to-today unblocked: 275 words, Gathering, Not Reading — art direction vision and vocabulary: 321 words, Work block reservation — weekday personal time now realistic: 172 words, Art direction POC deployed — /vision route live: 273 words, Art Direction to Production — SceneLayer wired, POC merged to master: 307 words, Gravity Layout — self-sizing cards replace CSS grid: 265 words, CLAUDE.md landed — /wrap fixed, lore sessions now reach the changelog: 198 words, Place Theme System — atmosphere picker, SceneLayer bridge, full aesthetic: 320 words, Taproot — debut: 149 words, Steps 5–6 — Uptime Kuma live, Vaultwarden container staged: 280 words, Taproot onboarded — add-project script, entry cohesion audit: 229 words, Fix project intake photo 413 error: 74 words, Bug sweep — soundboard spinner, phrase match, error surfacing: 221 words, Steps 6 + 8 complete — Vaultwarden live, rootstack.dev tunnel operational: 457 words, Usability overhaul complete — all 8 steps shipped: 450 words, Lost session recovery — research service confirmed live, PI-1 through PI-4 discovered complete: 222 words, Product Intelligence — PI-1 through PI-4 built (retrospective): 426 words, Build fix — output: export removed, analytics force-dynamic restored: 96 words, Immersive Places POC complete — effects, sound, and composite all validated: 378 words, PI-4 deployed — ingest, chunking, and retrieval live on Taproot: 242 words, WeekWidget fix + Bud brainstorm — inbox intelligence named and scoped: 228 words.